ODOT's US6 Connectivity Corridor Project Timeline (Estimated)
Questions & Comments should be directed to ODOT directly!
For QUESTIONS & CONTACT INFO regarding the US6 Connectivity Corridor Project:
U.S. 6 Connectivity Corridor | Ohio Department of Transportation
The U.S. 6 Connectivity Corridor is an ODOT project running from Cedar Point Drive within the City of Sandusky through the State Route 2 interchange with Rye Beach Road in the City of Huron. This project will increase the efficiency and operation of the U.S. 6 corridor for current and future traffic demands, enhance safety at high crash locations while addressing areas of poor roadway geometry, and improve multi-modal connectivity.
Real Time Traffic Impacts:
https://www.ohgo.com/nw-ohio?lt=41.417881854315986&ln=-82.69708561878801&z=10&ls=incident,construction,construction-future
ODOT's US6 Connectivity Corridor Page:
https://www.transportation.ohio.gov/travel/projects/116570
Sign up for weekly updates and construction reports:
(at the bottom of the page)
https://www.transportation.ohio.gov/





Twitter